Skip to product information
1 of 4

HuaZheng HZBB-10B ttr testing equipment turns ratio tester transformer turns ratio meter ttr digital transformer turns ratio meter

HuaZheng HZBB-10B ttr testing equipment turns ratio tester transformer turns ratio meter ttr digital transformer turns ratio meter

View full details

Description

transformer turns ratio meter ttr digital transformer turns ratio meter

I. Feature

1. It can automatically measure the transformer ratio of three-phase and single-phase, and calculate the ratio error.  

2. The number and polarity of transformer connection group can be measured.  And display a secondary wiring vector diagram, intuitive, the instrument has self-calibration function, according to the results of self-calibration can distinguish test line or instrument failure.  

3. Can display transformer voltage waveform diagram and phase relationship of the first and second, can measure transformer voltage harmonics harmonics, convenient analysis of transformer fault.  

4. CT, PT ratio, polarity test function.  

5. Perfect and reliable automatic protection function to ensure the instrument intact in all kinds of abnormal conditions.  

6. The instrument has 128M built-in memory (extensible 4G memory card), which can store all the measurement results. The database can be exported by usb disk, and the database can be opened by Excel spreadsheet.  

7. 7 inch true color touch screen operation, emWinGUI interface, simple and convenient operation.

Item

HZBB-10B

Variable ratio test range

0.820000

Test voltage

AC 12V,24V,40V,80V,160V

manual selection

Variable ratio test accuracy

0.1%0.8-2000

0.2%1000-5000

0.3%5000-20000

sizemm

470x410x195

weight

4.2kg

working voltage

AC 110220V  50/60Hz

Working temperature

-10-40

ambient humidity

10%-85%

Shipping Policy

  • Delivery Locations & Times: Equipment will be delivered to the location and at the time specified in your Hire Schedule. Delivery is acknowledged in writing or deemed to occur at the Hire Commencement Time.
  • Responsibility During Shipping: From the moment the Hire Period begins, the customer is solely responsible for all risks of loss or damage to the equipment until it is returned to Zenith or collected by Zenith from the agreed location.
  • Return Shipping: When returning equipment, customers must ensure all items and accessories are properly packed, secured, and labeled to prevent loss or damage during transit. Failure to do so may result in liability for repair or replacement costs.
  • Shipping Fees: Shipping fees are specified in the Hire Schedule and must be paid as outlined in your agreement.

Late Return Policy

  • Return Deadline: Equipment must be returned by the Date for Return specified in your Hire Schedule. If you anticipate a delay, you must notify Zenith as soon as possible.
  • Extensions: Requests for extensions must be made in advance. Approval is at Zenith’s discretion and may incur additional fees.
  • Late Fees: If equipment is not returned on time, you will be liable for liquidated damages at the rate specified in your Hire Schedule. This amount is a genuine pre-estimate of Zenith’s loss due to the delay.

Refund Policy

  • Bond Refund: After the equipment is returned and inspected, Zenith will refund the bond if there is no damage beyond normal wear and tear and all payments are up to date.
  • Deductions from Bond: If the equipment is damaged, Zenith may retain part or all of the bond to cover repair or replacement costs. If any monies are owed (including late fees), Zenith may also retain the bond to cover these amounts.
  • Shipping Fees and Additional Charges: Upon return, any outstanding shipping fees or additional charges (including late fees) must be paid before the bond is refunded.